Building work has been taking place at the Terras Hall over the winter in preparation for our new season.
- New accessible toilet and toilet area flooring
- Reconfiguration of the kitchen space
- Refitting of the rear fire door to make it fully air- and water-tight
- New kitchen and toilet lighting
- Replacement of rotten areas of subfloor in the toilet area
- New hatch and ladder provided to access loft space above kitchen
- Kitchen door replaced and widened
- Fitted insulation boards to the office ceiling
- Fitted museum-standard Marmoleum flooring in the museum area
- Demolished porch and install new entrance door
- Fit new flooring in the office space
- Remedial repairs to roof, guttering and drainage





