Guided tours from April to October

Visitor centre improvement completed

Building work has been taking place at the Terras Hall over the winter in preparation for our new season.

  • New accessible toilet and toilet area flooring
  • Reconfiguration of the kitchen space
  • Refitting of the rear fire door to make it fully air- and water-tight
  • New kitchen and toilet lighting
  • Replacement of rotten areas of subfloor in the toilet area
  • New hatch and ladder provided to access loft space above kitchen
  • Kitchen door replaced and widened
  • Fitted insulation boards to the office ceiling
  • Fitted museum-standard Marmoleum flooring in the museum area
  • Demolished porch and install new entrance door
  • Fit new flooring in the office space
  • Remedial repairs to roof, guttering and drainage